Tous les articles
ASI DEVELOPMENT·February 1, 2025·6 MIN DE LECTURE
Your 7-Day Navigation Map for ASI Builds
Par Farah Mensah
What to do each day
- Day 1: Write the problem statement and guardrails; lock them in version control.
- Day 2: Let agents draft architecture, you approve contracts and data boundaries.
- Day 3: Generate vertical slice, record Loom, and gather user feedback.
- Day 4: Add observability—event replay, prompt heatmaps, reversible migrations.
- Day 5: Red-team critical flows with attack prompts.
- Day 6: Performance pass: latency, cost envelopes, caching.
- Day 7: Launch a pilot with rollback toggles.
Rituals that keep teams safe
A daily 20-minute review with humans scanning logs and user feedback kept incident rates low while shipping 3x faster.
Build Blueprint · Creator
Une idée ? Obtenez la spécification que votre agent IA peut concrétiser.
Décrivez n'importe quel produit et obtenez un plan de construction complet — stack technique, modèle de données, écrans, API et un prompt prêt à coller pour Claude Code ou Cursor. Export en PDF.
Ouvrir le Blueprint ▸